2019-CONS-ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG
This project consisted of dust collector (with corresponding pipeline and electrical) project; Dust collector project (This project is to increase the foundation of 6 alumina silo dust collectors at the wharf, which are located at 40m of 2 # and 3 # silos and 12m away from the bucket); Spare belt conveyor, reinforced steel beam and electrical construction; PE (Polyethylene) pipes reconstruction; Helipad and related roads construction.